Barge designed and assembled by D&J
Viewed: 243 times.
|
Loaded and ready to go. Concrete dividers will be used as anchors.
Viewed: 205 times.
|
On the way to the site.
Viewed: 209 times.
|
A protective barrier was placed to prevent damage to the environment in case of oil spill.
Viewed: 194 times.
|
Over the site
Viewed: 212 times.
|
Lowering cables. Plane was located in 150 feet of water.
Viewed: 208 times.
|
Raising the Plane
Viewed: 192 times.
|
Top of the plane
Viewed: 246 times.
|
Seems to be in pretty good shape
Viewed: 207 times.
|
Plane was secured, then towed back to shore underwater
Viewed: 218 times.
|
Barge panel removed for plane retrieval
Viewed: 170 times.
|
Ran out of daylight, so final move to land was done at night.
Viewed: 198 times.
|
Inloading
Viewed: 207 times.
|
Wing view
Viewed: 179 times.
|
Side View
Viewed: 223 times.
|
Multiple straps needed to support weight evenly
Viewed: 206 times.
|
On the ground
Viewed: 208 times.
|
On land
Viewed: 383 times.
|
Inspection
Viewed: 217 times.
|
|
|
|
|
Cockpit
Viewed: 230 times.
|
Jon (left) and Darrell - D&J got it done with a little help from their friends.
Viewed: 352 times.
|